Construction recently completed on an 800,000 SF existing warehouse renovation in McDonough, GA.
The project specifications are as follows:
- Condition existing warehouse with insulated roof & deck walls as well as 47 roof top units to achieve heating/cooling requirements
- Fully automated warehouse climate control management system
- Replacement of 188 overhead dock doors insulated
- 150,000 gallon water storage tank and redundant diesel fire pump
- Fire sprinkler water containment system throughout entire warehouse
- 120,000 SF of aerosol type II & III storage rooms
- Three (3) full height demising walls and 17 overhead coiling fire doors to compartmentalize the warehouse
- Photo beam detector fire alarm system
- 13,450 SF office refurbishment & 2,500 SF new office/bathroom space
- 3,000 SF enclosed battery charge room supporting 30 battery chargers
- Power supply to 100,000 SF of packaging and conveyor equipment
- Relocation of existing overhead warehouse lights to match 275,000 SF of newly installed racking