Project Details
-
Two Separate Data Center Buildings (E & F) 152,150 SF/ 113,250 SF
-
Load Bearing Concrete Tilt-Up Construction
-
Power Base Build out of Interior Construction
-
Secondary Remote Security Station Near Loading Dock
-
Primary Lobby Security Office
-
Security Card Access Programming Door Access with Higher Security at POP Rooms, equipped with Bio Script (finger print) Recogni on Access Controls
-
LEED® Certified
-
Fully Motorized Vehicle Control Arm Gates and Motorized Rolling Security Crash Gates
-
Fully equipped lighting and surge protection system with UL Master Labels
-
Photocell Controlled Sight Lighting