Case Study | United Natural Foods Denver | AURORA, CO

Project Timeline - August 15, 2012 - September 25, 2013

Project Scope

Construction of a new refrigerated distribution warehouse for United Natural Foods, Inc.

Square Footage

550,000 square feet

Equipment Installed

  • CO2 + ammonia cascade refrigeration system
  • ESFR sprinkler system specifically for cold storage

Compliance Requirements

LEED Gold

Unique Challenges

Constructing a facility during winter in Aurora, CO. Varying temperature requirements throughout the complex (10° freezer, 35° cooler + cold dock, 45° wet room, 55° banana ripening room, 65° grain room).

Solutions

To achieve LEED Gold certification, a project must qualify for a minimum of 60 LEED points. Some of the solutions we implemented to accomplish this goal was to recycle condensation to be used as toilet water. Although it’s fairly common these days, at the time of this project, installing LED lights with motion sensors was considered very innovative.

To address the harsh winter conditions, we had to use hot water in our masonry and grouting work. Also, we covered everything in blankets as needed. We had to keep the slab covered for three days. Regardless of the challenge, ARCO is up for it.