Skip to main content

Construction recently completed on an 800,000 SF existing warehouse renovation in McDonough, GA.

The project specifications are as follows:

  • Condition existing warehouse with insulated roof & deck walls as well as 47 roof top units to achieve heating/cooling requirements
  • Fully automated warehouse climate control management system
  • Replacement of 188 overhead dock doors insulated
  • 150,000 gallon water storage tank and redundant diesel fire pump
  • Fire sprinkler water containment system throughout entire warehouse
  • 120,000 SF of aerosol type II & III storage rooms
  • Three (3) full height demising walls and 17 overhead coiling fire doors to compartmentalize the warehouse
  • Photo beam detector fire alarm system
  • 13,450 SF office refurbishment & 2,500 SF new office/bathroom space
  • 3,000 SF enclosed battery charge room supporting 30 battery chargers
  • Power supply to 100,000 SF of packaging and conveyor equipment
  • Relocation of existing overhead warehouse lights to match 275,000 SF of newly installed racking