Under Construction: Primus Pipe & Tube – Wildwood, FL
March 8, 2019
Construction is underway in Wildwood, FL for the 146,400 SF Primus Pipe & Tube project. Details of the project include:
BTS Steel Tube Manufacturing Facility
Pre-Engineered Metal Building
Eight (8) Drive-Thru Doors
Seven (7) 6 to 35 Ton Cranes
One (1) Tarping Crane
Employee Welfare Area
Do you have projects in the Southwest that needs the expertise of ARCO Design/Build? Reach out to our ARCO Design/Build Houston office and let them know about your next project.