Skip to main content

Construction is underway in Wildwood, FL for the 146,400 SF Primus Pipe & Tube project. Details of the project include:

  • BTS Steel Tube Manufacturing Facility
  • Pre-Engineered Metal Building
  • Eight (8) Drive-Thru Doors
  • Seven (7) 6 to 35 Ton Cranes
  • One (1) Tarping Crane
  • Employee Welfare Area

Do you have projects in the Southwest that needs the expertise of ARCO Design/Build? Reach out to our ARCO Design/Build Houston office and let them know about your next project.