Lakemont Building D

Fort Mill, SC

Lakemont Building C - Fort Mill, SC
Overview

Facility Space

Tilt Wall Construction with Formliner
6″ 4,000 PSI Concrete Slab on Grade with 10/10 Wire Mesh and 10 Mil Vapor Barrier
ESFR Sprinkler System
Two (2) 600 Amp Primary Electrical Services Featuring Two Separate Transformers and Two (2) Electrical Rooms, Combined 1,200 Amp Electrical Service
Twenty (20) Dock Positions and Nineteen (19) Knockouts
One (1) Drive-In Door
32′ Clear Height
108 Auto Parking Spaces
Single Load Building
Forty-Five (45) Trailer Parking Spaces
Prepped for 3.0 Air Changes Per Hour
Forty-Five (45) Mil TPO Roof
Clearstory Windows on Every Other Bay Along Dock Wall

Recent Projects

Featured Projects

Just as important, we’ll work to find ways to save time and money. One thing that sets ARCO Design/Build from some of our competitors is that every move we make is made with your success in mind. Decisions and recommendations are made based on what’s right for you, not what’s most profitable for us.

See All Projects