Project Details
-
72,000 SF
Renovation- Clean Production Facility
-
Client assembles high-voltage circuit breakers & gas insulated switchgears
-
Dust prevention critical in production process
-
Installed full height (40’) Thermax partitions to split up production areas and create new clean room
-
Installed new overhead and high-speed doors equipped with air curtains for dust control
-
Services 8 RTU’s and re-ducted entire supply/return system
-
Installed 500’ cleaned and capped copper for compressed air services
-
Painted existing CMU walls, and applied Dry-fall product to joist/deck
-
New Epoxy Floor